    安裝配電箱有相應的規范需要大家遵循,接下來我們成套電氣廠家就來說說安裝配電箱的注意事項有哪些。
    There are corresponding specifications for the installation of distribution box that we need to follow. Next, we will talk about the precautions for the installation of distribution box.
    (1)施工用電配電系統應設置總配電箱、分配電箱、開關箱,并按照“總-分-開”順序作分級設置,并形成“三級配電”模式。
    (1) The main distribution box, distribution box and switch box shall be set in the construction power distribution system, which shall be set in different levels according to the sequence of "main distribution open" and form a "three-level distribution" mode.
    (2)施工用配電系統各配電箱、開關箱的安裝位置要合理。總配電箱要盡量靠近變壓器或外電源處,以便電源的引入。分配電箱應盡量安裝在用電設備或負荷相對集中的中 心地帶,確保三相負荷保持平衡。開關箱安裝的位置應視現場情況和工況盡量靠近其控制的用電設備。
    (2) The installation position of each distribution box and switch box of construction power distribution system shall be reasonable. The main distribution box should be close to the transformer or external power supply as far as possible to facilitate the introduction of power supply. The distribution box shall be installed in the central area where the electric equipment or load is relatively concentrated as far as possible to ensure the balance of three-phase load. The installation position of the switch box shall be close to the electrical equipment controlled by it as far as possible according to the site conditions and working conditions.
    (3)保證臨時用電配電系統三相負荷平衡,施工現場的動力用電和照明用電應形成兩個用電回路,動力配電箱與照明配電箱應該分別設置。
    (3) To ensure the three-phase load balance of the temporary power distribution system, the power and lighting power on the construction site should form two power circuits, and the power distribution box and lighting distribution box should be set separately.
                       電氣成套設備廠家
    (4)施工現場所有用電設備必須有各自的專用的開關箱。
    (4) All electrical equipment on the construction site must have their own special switch box.
    (5)各級配電箱的箱體和內部設置必須符合規定,開關電器應標明用途,箱體應統一編號。停止使用的配電箱應切斷電源,箱門上鎖。成套電氣廠家固定式配電箱應設置圍欄,并有防雨防砸措施。
    (5) The cabinet and internal setting of distribution boxes at all levels must comply with safety regulations. The purpose of switchgear shall be indicated and the cabinet shall be numbered uniformly. The power supply shall be cut off and the door shall be locked when the distribution box is out of service. The fixed distribution box of complete electrical manufacturer shall be provided with fence and rain proof and smashing proof measures.
    (6)配電箱與配電柜的區別。根據GB/T20641-2006 《低壓成套開關設備和控制設備空殼體的一般要求》
    (6) The difference between distribution box and distribution cabinet. According to GB / t20641-2006 General requirements for empty shells of low voltage switchgear and controlgear assemblies
    配電箱一般是家庭用的,而配電柜則多用在集中供電中,比如說工業用電和建筑用電等,配電箱和配電柜都屬于成套設備,配電箱屬于低壓成套設備,配電柜有高壓有低壓。
    The distribution box is generally used for household use, while the distribution cabinet is mostly used in centralized power supply, such as industrial power and construction power. The distribution box and the distribution cabinet belong to complete sets of equipment, the distribution box belongs to low-voltage complete sets of equipment, and the distribution cabinet has high voltage and low voltage.
    首頁首頁 產品產品 電話電話 置頂置頂
    国产国拍亚洲精品福利| 亚洲AV无码一区二区三区性色 | 亚洲视频在线观看网站| 久久乐国产精品亚洲综合| 亚洲国产精品嫩草影院久久| 精品亚洲成a人在线观看| 亚洲AV日韩AV永久无码色欲| 亚洲精品国产精品| 久久亚洲AV成人无码国产电影| 亚洲成a人无码亚洲成av无码| 亚洲美国产亚洲AV| 亚洲Aⅴ在线无码播放毛片一线天| 亚洲av永久中文无码精品| 久久亚洲精品11p| 亚洲精品麻豆av| 久久久久国产亚洲AV麻豆| 狠狠综合久久综合88亚洲| 国产成人亚洲精品影院| 亚洲欭美日韩颜射在线二| 亚洲精品你懂的在线观看| 国产亚洲高清不卡在线观看| 久久夜色精品国产嚕嚕亚洲av| 亚洲AV日韩精品久久久久| 中文字幕亚洲精品| 亚洲欧洲日本精品| 天堂亚洲国产中文在线| 亚洲精品GV天堂无码男同| 亚洲äv永久无码精品天堂久久 | 自拍偷自拍亚洲精品被多人伦好爽| 亚洲午夜福利AV一区二区无码| 亚洲成A人片在线观看无码不卡| 久久精品视频亚洲| 亚洲男人天堂影院| 亚洲愉拍一区二区三区| 337p日本欧洲亚洲大胆人人 | 亚洲国产成人精品无码区在线秒播 | 亚洲乱理伦片在线观看中字| 校园亚洲春色另类小说合集 | 久久狠狠爱亚洲综合影院| 亚洲国产精品ⅴa在线观看| 亚洲国产精品人人做人人爱|